Concrete bags calculator (60 lb and 80 lb)

See how many 60 lb and 80 lb bags a pour will take, and whether bags beat a ready-mix truck after waste and a short-load fee.

Volume
–
Cubic yards
–
80 lb bags
–
60 lb bags
–
Ready-mix material
–
Cost in 80 lb bags
–
Cost in 60 lb bags
–

A 10% waste factor is a typical starting point. Use 10–15% on uneven subgrade, odd shapes, or pump jobs. Ready-mix planning prices along the Wasatch Front often land roughly $160–$210 per cubic yard before delivery or short-load fees — enter the quote you have. Bag counts use QUIKRETE Concrete Mix yields (80 lb ≈ 0.60 cu ft, 60 lb ≈ 0.45 cu ft) and round up to whole bags. Other brands may differ; check the bag.

Is the pour bigger than bags can handle?

Get a ready-mix or contractor quote in Salt Lake, Davis, Weber and Utah counties.

Get a concrete quote

Bag math, without the guesswork

This page uses the same calculator as our main concrete tool, with the bag comparison front and center. An 80 lb QUIKRETE bag yields about 0.60 cubic feet (about 45 bags per cubic yard). A 60 lb bag yields about 0.45 cubic feet (about 60 bags per yard). Mix, haul and place time is on you if you go the bag route; a truck places yards much faster once the forms are ready.

Unit conversions you will actually use

One cubic yard equals 27 cubic feet. Thickness and footing width are usually measured in inches, so divide those by 12 before you multiply. A 20-by-24-foot driveway at 4 inches is 20 × 24 × (4 ÷ 12) = 160 cubic feet, which is 160 ÷ 27 ≈ 5.93 cubic yards before waste. With a 10% waste factor you would order about 6.52 yards — most people round the ticket up with their supplier.

An 80 lb bag of QUIKRETE Concrete Mix yields about 0.60 cubic feet, so a cubic yard is about 45 bags. A 60 lb bag yields about 0.45 cubic feet, or about 60 bags per yard. Other brands can differ; read the bag.

How much extra should you add for waste?

This calculator defaults to 10% extra, which is a reasonable starting point for a rectangular slab on a reasonably even, compacted base. Use 10–15% if the subgrade varies, the shape has curves or cutouts, or the concrete will be pumped. QUIKRETE’s own training example shows a slab that varies from 4 to 5 inches needing about 12.5% more than a flat 4-inch pour. It is cheaper to have a little left over than to short the pour and add a cold joint.

Ready-mix vs. 60 lb and 80 lb bags

Bags are practical for small jobs: a few post holes, a stoop repair, or a pad well under a cubic yard. Once you are around a yard or more, a ready-mix truck is usually easier, but plants often add a short-load fee when the order is under about 3–5 cubic yards. Enter your quoted price per yard, any short-load fee, and the bag prices you see at the store. The calculator will tell you which option is the lower material cost for this pour. Labor, forming, and delivery still sit on top of those numbers.

Wasatch Front ready-mix planning prices often land roughly $160–$210 per cubic yard before delivery or short-load fees. That is a planning range, not a quote — use the number on your ticket.

Related tools

City calculators:

Common questions

How many 80 lb bags of concrete do I need?

Divide your total cubic feet (including waste) by 0.60 and round up. A cubic yard is about 45 of the 80 lb bags.

How many 60 lb bags do I need?

Divide cubic feet by 0.45 and round up. A cubic yard is about 60 of the 60 lb bags.

When are bags cheaper than ready-mix?

On small pours, especially under about a cubic yard, or when a short-load fee wipes out the per-yard savings. Enter both prices here and compare.

Do bag yields vary by brand?

Yes. These counts use QUIKRETE Concrete Mix published yields. Check the bag in your hands if you are buying another brand.