Concrete cost per yard in Utah
Enter your ready-mix price, any short-load fee, and 60/80 lb bag prices to estimate material cost for a pour along the Wasatch Front.
Use this for a continuous footing or grade beam. For round post holes, switch to Post hole / column and enter diameter, depth and the number of holes.
Treats a solid poured stair as a triangular wedge. Treads equal risers minus one (the top landing is the upper floor). This is a planning volume, not a code check for rise and run.
- Volume
- –
- Cubic yards
- –
- 80 lb bags
- –
- 60 lb bags
- –
- Ready-mix material
- –
- Cost in 80 lb bags
- –
- Cost in 60 lb bags
- –
A 10% waste factor is a typical starting point. Use 10–15% on uneven subgrade, odd shapes, or pump jobs. Ready-mix planning prices along the Wasatch Front often land roughly $160–$210 per cubic yard before delivery or short-load fees — enter the quote you have. Bag counts use QUIKRETE Concrete Mix yields (80 lb ≈ 0.60 cu ft, 60 lb ≈ 0.45 cu ft) and round up to whole bags. Other brands may differ; check the bag.
Want an installed quote?
Local contractors serving Salt Lake, Davis, Weber and Utah counties can price labor and material together.
Get a concrete quoteWhat a yard costs here
Ready-mix is sold by the cubic yard. Along the Wasatch Front, a planning range of roughly $160–$210 per yard before delivery or short-load fees is a reasonable place to start, then replace it with a quoted ticket. Small orders are often hit with a short-load fee under about 3–5 yards. This page does not include forming, finishing, demolition, or permit fees. For an installed driveway or patio range, use the driveway cost and patio cost calculators.
Unit conversions you will actually use
One cubic yard equals 27 cubic feet. Thickness and footing width are usually measured in inches, so divide those by 12 before you multiply. A 20-by-24-foot driveway at 4 inches is 20 × 24 × (4 ÷ 12) = 160 cubic feet, which is 160 ÷ 27 ≈ 5.93 cubic yards before waste. With a 10% waste factor you would order about 6.52 yards — most people round the ticket up with their supplier.
An 80 lb bag of QUIKRETE Concrete Mix yields about 0.60 cubic feet, so a cubic yard is about 45 bags. A 60 lb bag yields about 0.45 cubic feet, or about 60 bags per yard. Other brands can differ; read the bag.
How much extra should you add for waste?
This calculator defaults to 10% extra, which is a reasonable starting point for a rectangular slab on a reasonably even, compacted base. Use 10–15% if the subgrade varies, the shape has curves or cutouts, or the concrete will be pumped. QUIKRETE’s own training example shows a slab that varies from 4 to 5 inches needing about 12.5% more than a flat 4-inch pour. It is cheaper to have a little left over than to short the pour and add a cold joint.
Ready-mix vs. 60 lb and 80 lb bags
Bags are practical for small jobs: a few post holes, a stoop repair, or a pad well under a cubic yard. Once you are around a yard or more, a ready-mix truck is usually easier, but plants often add a short-load fee when the order is under about 3–5 cubic yards. Enter your quoted price per yard, any short-load fee, and the bag prices you see at the store. The calculator will tell you which option is the lower material cost for this pour. Labor, forming, and delivery still sit on top of those numbers.
Wasatch Front ready-mix planning prices often land roughly $160–$210 per cubic yard before delivery or short-load fees. That is a planning range, not a quote — use the number on your ticket.
Related tools
City calculators:
Common questions
How much is a yard of concrete in Utah?
As a planning range, ready-mix along the Wasatch Front often lands roughly $160–$210 per cubic yard before delivery or short-load fees. Enter the quote you actually received; this is not a bid.
What is a short-load fee?
Many plants add a fee when the order is under about 3–5 cubic yards, because the truck is not carrying a full load. Enter that fee here so the ready-mix vs bags comparison is honest.
Does the per-yard price include labor?
No. The figure you enter is material (and the short-load fee if you include it). Forming, placement, finishing and removal are separate, which is why the driveway and patio cost pages also show an installed planning range.
When do bags beat a truck on cost?
Usually on small pours, or when the short-load fee is high relative to a few bags. Change the prices on this page and read the recommendation.