Concrete calculator
Work out cubic yards and bag counts for a slab, footing, post hole, column or stairs. Add your local prices to compare ready-mix with 60 lb and 80 lb bags.
For a round patio, fire-pit pad or hot-tub pad. Measure straight across the widest point.
For a poured foundation, stem or retaining wall. Figure the footing on the Footing tab, then use Add to my project to total both.
Use this for a continuous footing or grade beam. For round post holes, switch to Post hole / column. Wasatch Front building departments commonly set frost depth at 30 inches; see frost line depth in Utah.
Treats a solid poured stair as a triangular wedge. Treads equal risers minus one (the top landing is the upper floor). This is a planning volume, not a code check for rise and run.
Curb depth is the curb's thickness front to back; curb height runs from its bottom to its top. Work in the public right-of-way usually needs a city permit and the city's standard dimensions.
Waste & prices
–cubic yards to order, waste included
– · – · –
- Ready-mix material + short-load fee
- –
- Cost in 80 lb bags
- –
- Cost in 60 lb bags
- –
- Ready-mix truck loads
- –
Rebar, gravel base & forms for this slab
- Rebar grid
- –
- Gravel base
- –
- Form boards (perimeter)
- –
Rebar assumes a grid both ways, 3 inches in from each edge, plus 10% for laps and offcuts. Gravel tons use about 1.4 tons per cubic yard; it varies by material, so ask your supplier. Planning numbers only: your contractor or plans set bar size and spacing.
My project
Project total: –
A 10% waste factor is a typical starting point. Use 10–15% on uneven subgrade, odd shapes, or pump jobs. Ready-mix planning prices along the Wasatch Front often land roughly $160–$210 per cubic yard before delivery or short-load fees — enter the quote you have. Bag counts use QUIKRETE Concrete Mix yields (80 lb ≈ 0.60, 60 lb ≈ 0.45, 50 lb ≈ 0.375, 40 lb ≈ 0.30 cu ft) and round up to whole bags. Weight uses about 145 lb per cubic foot. Other brands may differ; check the bag.
Pouring along the Wasatch Front?
Get a quote from a local concrete contractor serving Salt Lake, Davis, Weber and Utah counties for your patio, driveway, pad or footings.
Get a concrete quoteHow the math works
Volume in cubic feet = length × width × thickness, with inches divided by 12. Divide by 27 for cubic yards. Round post holes use π × radius² × depth. Solid stairs are modeled as a triangular wedge: width × total run × total rise ÷ 2, with treads equal to risers minus one. Bags = volume ÷ bag yield, rounded up.
Unit conversions you will actually use
One cubic yard equals 27 cubic feet. Thickness and footing width are usually measured in inches, so divide those by 12 before you multiply. A 20-by-24-foot driveway at 4 inches is 20 × 24 × (4 ÷ 12) = 160 cubic feet, which is 160 ÷ 27 ≈ 5.93 cubic yards before waste. With a 10% waste factor you would order about 6.52 yards — most people round the ticket up with their supplier.
An 80 lb bag of QUIKRETE Concrete Mix yields about 0.60 cubic feet, so a cubic yard is about 45 bags. A 60 lb bag yields about 0.45 cubic feet, or about 60 bags per yard. Other brands can differ; read the bag.
How much extra should you add for waste?
This calculator defaults to 10% extra, which is a reasonable starting point for a rectangular slab on a reasonably even, compacted base. Use 10–15% if the subgrade varies, the shape has curves or cutouts, or the concrete will be pumped. QUIKRETE’s own training example shows a slab that varies from 4 to 5 inches needing about 12.5% more than a flat 4-inch pour. It is cheaper to have a little left over than to short the pour and add a cold joint.
Ready-mix vs. 60 lb and 80 lb bags
Bags are practical for small jobs: a few post holes, a stoop repair, or a pad well under a cubic yard. Once you are around a yard or more, a ready-mix truck is usually easier, but plants often add a short-load fee when the order is under about 3–5 cubic yards. Enter your quoted price per yard, any short-load fee, and the bag prices you see at the store. The calculator will tell you which option is the lower material cost for this pour. Labor, forming, and delivery still sit on top of those numbers.
Wasatch Front ready-mix planning prices often land roughly $160–$210 per cubic yard before delivery or short-load fees. That is a planning range, not a quote — use the number on your ticket.
Related tools
City concrete calculators along the Wasatch Front:
Salt Lake County
Weber County
Utah County
Utah concrete, radon and flip guides
Common questions
How many 80 lb bags of concrete make a cubic yard?
About 45. QUIKRETE lists an 80 lb bag of Concrete Mix as yielding about 0.60 cubic feet, and a cubic yard is 27 cubic feet.
How many 60 lb bags make a cubic yard?
About 60. A 60 lb bag yields about 0.45 cubic feet, so 27 divided by 0.45 is 60 bags.
How thick should a concrete slab be?
QUIKRETE’s guidance says slabs are generally poured 4 inches or 6 inches thick. Driveways and slabs that carry vehicles are usually thicker than walkways; follow your city’s permit requirements and your contractor’s spec.
Should I add extra for waste?
Yes. Uneven ground and spillage add up. QUIKRETE’s example shows a slab that varies from 4 to 5 inches thick needs about 12.5% more concrete than a flat 4 inch slab. This calculator defaults to 10% extra; change it to 10–15% if the site is uneven.
Bags or ready-mix?
Bags are practical for small jobs like post holes and small pads. For larger pours, many homeowners order ready-mix by the cubic yard; ask local suppliers along the Wasatch Front for their price per yard and any short-load fee under about 3–5 yards.
Sources
- QUIKRETE Concrete Mix #1101 data sheet (bag yields): quikrete.com
- QUIKRETE mixing and placing training guide (slab thickness, worked example): quikrete.com