Concrete calculator for Syracuse, Utah

Free cubic-yard, bag, and ready-mix estimator for slabs, driveways, patios, footings, post holes and stairs in Syracuse (Davis County).

Syracuse has grown quickly on the west side of Davis County, toward the Great Salt Lake, so a lot of concrete work is a first pour on a newer lot: a driveway, sidewalk, patio, or fence footings after the house is already up.

Volume
–
Cubic yards
–
80 lb bags
–
60 lb bags
–
Ready-mix material
–
Cost in 80 lb bags
–
Cost in 60 lb bags
–

A 10% waste factor is a typical starting point. Use 10–15% on uneven subgrade, odd shapes, or pump jobs. Ready-mix planning prices along the Wasatch Front often land roughly $160–$210 per cubic yard before delivery or short-load fees — enter the quote you have. Bag counts use QUIKRETE Concrete Mix yields (80 lb ≈ 0.60 cu ft, 60 lb ≈ 0.45 cu ft) and round up to whole bags. Other brands may differ; check the bag.

Get a Syracuse concrete quote

We’ll share your job with up to 3 local contractors who service Davis County and the rest of the Wasatch Front.

Get a concrete quote

Typical projects in Syracuse

Newer lots often leave the patio or a third-car pad for the homeowner. Measure the remaining area, pick a thickness (four inches for cars or a patio; five to six if heavier vehicles will park on it), and run the calculator before you call a plant.

Open west-side sites can be windy, which dries a finish in summer and makes a winter weather plan more important. Use 10% waste on a clean rectangle and more if the builder’s subgrade is still uneven. Check HOA or city rules on finish and the public approach.

Unit conversions you will actually use

One cubic yard equals 27 cubic feet. Thickness and footing width are usually measured in inches, so divide those by 12 before you multiply. A 20-by-24-foot driveway at 4 inches is 20 × 24 × (4 ÷ 12) = 160 cubic feet, which is 160 ÷ 27 ≈ 5.93 cubic yards before waste. With a 10% waste factor you would order about 6.52 yards — most people round the ticket up with their supplier.

An 80 lb bag of QUIKRETE Concrete Mix yields about 0.60 cubic feet, so a cubic yard is about 45 bags. A 60 lb bag yields about 0.45 cubic feet, or about 60 bags per yard. Other brands can differ; read the bag.

How much extra should you add for waste?

This calculator defaults to 10% extra, which is a reasonable starting point for a rectangular slab on a reasonably even, compacted base. Use 10–15% if the subgrade varies, the shape has curves or cutouts, or the concrete will be pumped. QUIKRETE’s own training example shows a slab that varies from 4 to 5 inches needing about 12.5% more than a flat 4-inch pour. It is cheaper to have a little left over than to short the pour and add a cold joint.

Ready-mix vs. 60 lb and 80 lb bags

Bags are practical for small jobs: a few post holes, a stoop repair, or a pad well under a cubic yard. Once you are around a yard or more, a ready-mix truck is usually easier, but plants often add a short-load fee when the order is under about 3–5 cubic yards. Enter your quoted price per yard, any short-load fee, and the bag prices you see at the store. The calculator will tell you which option is the lower material cost for this pour. Labor, forming, and delivery still sit on top of those numbers.

Wasatch Front ready-mix planning prices often land roughly $160–$210 per cubic yard before delivery or short-load fees. That is a planning range, not a quote — use the number on your ticket.

Radon in Davis County

Radon is a separate issue from concrete, but it matters in Syracuse. Utah IBIS long-term (2017) county averages put Davis County at 2.9 pCi/L, compared with a statewide average of 3.2 pCi/L. Those are county figures, not a reading for your house. The 2026 State of Radon in Utah report found 69.6% of tests above 2.0 pCi/L and about one in three above the EPA action level of 4.0 pCi/L; benches often test higher than valley floors. Look up your ZIP in the Utah DEQ radon ZIP tool and use a test kit. Estimate mitigation cost if you already have a high result.

Utah concrete guides

Thickness and winter weather matter as much as yardage. Start with how thick a Utah driveway should be and pouring concrete in freezing weather.

More concrete tools

City concrete calculators along the Wasatch Front:

Common questions

How do I calculate concrete in Syracuse?

Use the calculator on this page: enter a slab, footing, post hole or stair, add a 10% waste factor (or 10–15% if the ground is uneven), and compare ready-mix with 60 and 80 lb bags. Then confirm the number with a contractor who services Davis County.

How much does ready-mix cost in Syracuse?

Wasatch Front planning prices often land roughly $160–$210 per cubic yard before delivery or short-load fees. Enter the quote you have; this is not a bid for your street.

Should I use bags or a truck in Syracuse?

Bags are practical under about a cubic yard. Larger driveways and patios usually go to a ready-mix truck. A short-load fee is common under about 3–5 yards — enter it so the comparison is fair.

Do I need a permit for a driveway or sidewalk in Syracuse?

Public sidewalks, approaches and sometimes driveway work can require a permit or a licensed contractor. Check with Syracuse before you demolish or pour in the right-of-way.