Rebar calculator for concrete slabs

Count the bars, linear feet and cost of a rebar grid for a driveway, patio or shop slab.

–bars to buy

Slab area
–
Bars running the length
–
Bars running the width
–
Total rebar
–
Tie points (upper bound)
–
Rebar cost
–

A planning takeoff for a flat rectangular grid. It does not size bar, design for loads, or replace your plans. Enter the price on the tag at your store.

Need the concrete too? The slab calculator gives yards, bags, a gravel base and form boards for the same slab.

Want it formed, reinforced and poured?

Share the job with up to 3 contractors who service Salt Lake, Davis, Weber and Utah counties.

Get a concrete quote

How the rebar grid is counted

Bars run both ways. Hold the grid in from the edges (3 inches here), so a 20-foot slab has a 19.5-foot grid. At 18 inches on center that fits 19.5 ÷ 1.5 = 13 spaces, or 14 bars, each way. Fourteen bars × 19.5 feet × 2 directions = 546 linear feet. Add 10% for laps and offcuts (600.6 ft) and divide by 20-foot bars: 31 bars.

Utah slabs see hard freeze-thaw cycles. Reinforcement helps hold cracks tight, but joints, a compacted base and drainage do most of the work against cracking. See how thick a Utah driveway should be.

Related tools

Common questions

How much rebar do I need for a slab?

Lay out a grid both ways at your spacing, held a few inches in from the edges. Count the bars each way, multiply by their length, add about 10% for laps and offcuts, and divide by the bar length you buy (usually 20 feet). A 20 × 20 ft slab at 18 inches on center needs about 31 twenty-foot bars.

What rebar spacing is common for a driveway or patio?

Residential slabs are often reinforced with #3 or #4 bar at 12 to 24 inches on center, or with welded wire mesh or fiber, and some are not reinforced at all. There is no single right answer; your contractor, plans or city sets it.

Where should rebar sit in the slab?

Near the middle of the slab's thickness, held up on chairs or dobies, not lying on the dirt. Rebar on the ground does very little.

Does this include laps?

The 10% default covers laps where bars join and offcuts. Long runs over 20 feet need lap splices; raise the percentage if most runs are long.